244G Concrete Finisher Practice Quiz
Free · 200 Questions.

Based on the Red Seal Concrete Finisher exam blueprint: placing and levelling, floating, troweling, surface treatments, curing, joints, repairs and grouting

📝 100 Q practice test✅ Pass: 70%⏱ Up to 4 hr🔁 Free retakes Updated: October 2026
⚠️ExamHub is an independent study resource and is not affiliated with, endorsed by, or reviewed by Skilled Trades Ontario or the Red Seal program. Questions are original practice materials.
Choose your mode
Mode 1
Test Me
100 questions with a 240-minute timer. 70% (70/100) to pass, with complete answer review at the end.
⏱ 240 min100 Qs70% to passAnswer review
Mode 2
Practice
Sequential practice with detailed explanations after every question. Numbered navigator with auto-saving progress.
📖 Explanations🔊 Voice narrationAuto-save
Or practice by topic
Common Occupational Skills
28 questions
Site Preparation
18 questions
Placing and Levelling Concrete
36 questions
Finishing Plastic Concrete
50 questions
Curing and Protecting Concrete
30 questions
Repairs, Surface Treatments and Grouting
38 questions
📲 Add 244G Concrete Finisher Practice Quiz to your Home Screen

Practice on the go and jump straight back to where you left off.

About the certification

Cement (Concrete) Finisher (244G) Certificate of Qualification

In Ontario, Cement (Concrete) Finisher is trade code 244G, a non-compulsory trade administered by Skilled Trades Ontario. Across Canada it is the Red Seal trade Concrete Finisher, so passing the Certificate of Qualification exam also earns the interprovincial Red Seal endorsement. Apprenticeship is about 4,020 hours on the job and 480 hours of technical training.

The Red Seal exam has 100 multiple-choice questions in 6 blocks: common occupational skills (14 questions), site preparation (9), placing and levelling concrete (18), finishing plastic concrete (25), curing and protecting concrete (15) and modifying and repairing concrete and grouting (19). Between 20 and 30% of the questions test knowledge and recall, 60 to 70% procedural and application, and 5 to 15% critical thinking. The Red Seal self-assessment guide gives the pass mark as 70%.

ExamHub's free 244G practice quiz has 200 original questions weighted to the real exam blocks and tasks, with an explanation and a source for every answer. Safety questions use Ontario's Construction Projects regulation (O. Reg. 213/91); finishing, curing and repair questions use free industry guides, and questions that rest on a manufacturer's data sheet or on a rule from outside Ontario say so in the question.

What's covered

200 practice questions, by block

Categories follow the 6 Red Seal exam blocks, weighted like the real exam.

Topic breakdown

  • Common Occupational Skills28
  • Site Preparation18
  • Placing and Levelling Concrete36
  • Finishing Plastic Concrete50

 

  • Curing and Protecting Concrete30
  • Repairs, Surface Treatments and Grouting38

Try a few

Sample 244G Concrete Finisher practice questions

Five sample questions from the question bank, with the answer and explanation.

Question 1
A crew is handling wet concrete and cement products all day on an Ontario project. What must the employer provide under O. Reg. 213/91 s. 30?
  • Washing facilities with clean water, soap and individual towels
  • A drinking-water cooler and disposable cups at the gate
  • A first-aid kit and a tube of barrier cream on the truck
  • A portable shower trailer with hot water on site on every pour day

Why: Section 30 requires that workers who handle or use corrosive, poisonous or other substances likely to endanger their health be provided with washing facilities with clean water, soap and individual towels. Wet cement is corrosive to skin.

Question 2
A geotechnical report calls for a 150 to 200 mm capillary break of coarse crushed stone under an interior slab. What does CIP 29 say to place on top of the stone before the vapor retarder goes down?
  • About 50 mm of graded fine compactable fill, so sharp stone cannot puncture the retarder
  • About 50 mm of concrete sand, so the coarse stone drains faster than before
  • A second layer of polyethylene that can be peeled away after the pour
  • A 25 mm layer of lean mortar screeded smooth, so the retarder lies flat on a hard, even surface

Why: CIP 29 says to choke the top of a coarse capillary break with 2 in. (about 50 mm) of graded, fine-grained compactable fill and to lay the retarder on that smooth, compacted surface. A coarse stone layer does not stop vapor from the sub-grade, so the retarder is still needed above it.

Question 3
Concrete is pumped to a deck, and the slump and air tests taken at the truck chute do not match the results at the point of placement. Where does the Minnesota DOT manual say slump and air should be measured?
  • At the discharge end of the pump
  • At the batch plant, before loading
  • At the pump hopper, before pumping starts
  • At the truck drum after one revolution

Why: The manual says concrete tends to lose slump and entrained air when pumped, so both slump and air tests should be measured at the discharge end of the pump. If that is not practical, a correlation between truck discharge and pump outlet is established.

Question 4
On a cool morning a slab placed on a very cold subgrade appears ready to trowel much earlier than expected. What is the risk of troweling it now?
  • The top has stiffened ahead of the concrete below, so troweling now seals in bleed water and air and risks blisters
  • Cracking, because the subgrade has drawn out all the bleed water and left the whole slab too dry
  • Frost damage, because the cold has stopped hydration in the top layer until the afternoon
  • Over-troweling, because the subgrade has sped up setting through the full depth of the slab

Why: NRMCA explains that a cold subgrade makes the slab stiffen from the top down. The surface appears ready while the concrete beneath is still bleeding and releasing air, and finishing then traps them under a sealed skin.

Question 5
A basement slab will later receive adhesive-applied resilient flooring. Which curing approach does NRMCA suggest unless the manufacturer says otherwise?
  • Plastic sheeting or waterproof paper for 3 to 7 days, not a standard curing compound
  • A heavy wax-based membrane compound applied in two coats at right angles
  • Continuous ponding with water for the whole 28 days before the flooring goes on
  • No curing at all, since the flooring will cover the slab surface in any case

Why: NRMCA's slab moisture sheet advises curing to retain moisture with plastic sheeting or waterproof paper for 3 to 7 days, and to avoid curing compounds on floors to receive coverings or coatings unless the manufacturer states otherwise. Moist curing lengthens drying time.

FAQ

244G Concrete Finisher questions, answered

How many questions are on the 244G Red Seal exam?

The Red Seal Concrete Finisher exam has 100 multiple-choice questions. ExamHub's bank has 200 questions, and Test Mode draws a 100-question timed simulation.

What is the pass mark for the 244G exam?

The Red Seal self-assessment guide for this trade gives the pass mark as 70%. The Red Seal exam page does not state a time limit, and ExamHub's Test Mode allows up to 4 hours.

What topics are on the Concrete Finisher exam?

6 blocks: common occupational skills (14 questions), site preparation (9), placing and levelling concrete (18), finishing plastic concrete (25), curing and protecting concrete (15) and modifying and repairing concrete and grouting (19).

Is the 244G trade compulsory in Ontario?

No. Cement (Concrete) Finisher (244G) is a non-compulsory trade in Ontario. Skilled Trades Ontario issues the Certificate of Qualification when the exam is passed, and the trade is part of the Red Seal program.

Are these the real exam questions?

No. These are original practice questions written from the Red Seal standard and free public sources. They are not copies of exam questions.

Other free practice tests

403A Carpenter
180 questions
180 questions on layout, formwork, framing, and finish carpentry.
ASP Construction (SSGCC)
150 questions
150 questions covering LSST, CSTC, fall protection, lockout, and trench safety.
Working at Heights (CPO)
183 questions
183 questions on fall protection, ladders, anchors and rescue planning.
441C Horticultural Tech
220 questions
220 questions on plants, soil, construction, irrigation and turf care.
449A Roofer
190 questions
190 questions on roof safety, low slope membranes, shingles, waterproofing and repairs.
BOABC Level 1 Building Official Exam
211 questions
211 questions on Part 9 of the BC Building Code 2024: egress, fire protection, foundations, framing and envelope.
RBQ Project & Site Mgmt
200 questions
200 questions covering Quebec Civil Code, plans & specs, BSDQ tendering, CPM scheduling, and quality management.
253A Heat & Frost Insulator
199 questionsNew
199 questions on industrial and commercial insulation, fire stop, cryogenic systems and asbestos abatement.