CCQ Plumber Qualification Exam Free Practice Test
Questions and Answers.

Based on the CCQ exam information sheet and the Quebec Construction Code, Chapter III – Plumbing (NPC 2020, modified)

📝 61 Q test✅ Pass: 60%⏱️ 180 min📖 Open book (Code) Last reviewed: 31 Oct 2026
⚠️ExamHub is an independent study resource and is not affiliated with the Commission de la construction du Québec (CCQ). Questions are original practice materials. 61 questions, 180 minutes, 60% passing grade. The official exam is open book with the Code; the practice test is closed book so you learn the rules.
Choose your mode
Mode 1
Test Me
61 questions with a 180-minute timer. 60% (37/61) to pass, with complete answer review at the end.
⏱ 180 min61 Qs60% to passAnswer review
Mode 2
Practice
Sequential practice with detailed explanations after every question. Numbered navigator with auto-saving progress.
📖 Explanations🔊 Voice narrationAuto-save
Or practice by topic
Preparing the Work
29 questions
Installing and Modifying
86 questions
Repairing and Maintaining
32 questions
📲 Add to your Home Screen

Practice on the go and jump straight back to where you left off.

About the examination

CCQ Qualification Exam: Plumber (Pipe Fitter)

In Québec's construction industry, the Commission de la construction du Québec (CCQ) sets a qualification exam for people seeking a plumber (tuyauteur) competency certificate. The exam has 61 questions, lasts 3 hours and requires 60%. It is open book: the Québec Construction Code, Chapter III – Plumbing, and the National Plumbing Code of Canada 2020 (modified) are allowed.

ExamHub's free practice test contains 147 original questions written from public texts, in French first and then translated into English: the Québec Plumbing Code, the RBQ explanatory booklet (2024) and the Safety Code for the construction industry. Each explanation cites the article involved.

What's covered

147 practice questions, by block

Block breakdown

  • Preparing the Work29
  • Installing and Modifying86
  • Repairing and Maintaining32

Try a few

Sample CCQ Plumber practice questions

Sample questions from the bank — practice with the interactive module above for the 61-question, 3-hour exam simulation.

Question 1
A plumber must install a new building sewer between the building and the property line. What does Chapter III of the Québec Construction Code provide for this work?
  • It is subject to the Code, because the plumbing installation now extends to the property boundaries.
  • It falls under municipal civil engineering, so the Plumbing Code never applies to it, regardless of distance.
  • It is subject to the Code on the first metre outside the building's foundation wall, and no further.
  • It is subject to the Code if the building sewer serves more than one dwelling unit or a commercial building, and otherwise not.

Why: Article 3.02 applies the Code to work located in a building or outside it, within the property boundaries. Water service pipes and building sewers are therefore subject to it (type of piping, slope, protection, venting).

Question 2
A 40 m long trench is dug to lay a pipe. What is the minimum number of ladders required?
  • 3 ladders
  • 2 ladders
  • 4 ladders
  • 1 ladder

Why: A ladder is required for every 15 linear metres of trench or fraction thereof: 40 m includes two full 15 m portions and a fraction, so 3 ladders. Each one rests on the bottom and extends at least 1 m above the ground.

Question 3
What are the minimum dimensions of a rectangular catch basin (fosse de retenue) under the Québec Code?
  • 450 mm in length (in the direction of the outlet pipe) by 300 mm in width.
  • 600 mm in length (in the direction of the outlet pipe) by 450 mm in width.
  • 600 mm in length (in the direction of the outlet pipe) by 600 mm in width.
  • 900 mm in length (in the direction of the outlet pipe) by 600 mm in width.

Why: Article 2.4.3.7. requires a one-piece basin, watertight and smooth on the inside, at least 600 mm in length (in the direction of the outlet pipe) by 450 mm in width; a circular basin is at least 560 mm in diameter.

Question 4
In a separate system, where must the storm building drain be located in relation to the sanitary building drain?
  • To the left of the sanitary drain, looking toward the street, as seen from the building.
  • To the right of the sanitary drain, looking toward the street, as seen from the building.
  • Above the sanitary drain, in the same trench and within 300 mm.
  • At the same level as the sanitary drain, on the other side of the service entrance.

Why: Québec adds a layout rule to Article 2.4.7.1.: in a separate system, the storm drain is located to the left of the sanitary drain, looking toward the street, as seen from the building.

Question 5
Which conditions promote the growth of Legionella bacteria in a building's water systems?
  • A temperature above 60 °C, a pressure above 550 kPa and copper pipes.
  • A temperature between 20 and 50 °C, stagnant water and poor sanitary condition of the systems.
  • A temperature below 4 °C, a velocity above 3 m/s and galvanized steel pipes.
  • A lead content above 0.2%, an acidic pH and the presence of chlorine in the water.

Why: Legionella is transmitted mainly by inhaling water vapour or mist. It proliferates between 20 and 50 °C, in the presence of stagnation or poor sanitary condition.

FAQ

CCQ plumber exam questions, answered

What is the format of the CCQ plumber qualification exam?

The CCQ qualification exam for the Plumber (Pipe Fitter) trade has 61 questions worth 1 point each, lasts 3 hours and requires a 60% pass mark (information sheet consulted October 19, 2026; check the current sheet on ccq.org before you register).

Is the exam open book?

Yes. The CCQ supplies the Code de construction du Québec, Chapter III – Plumbing, and the National Plumbing Code of Canada 2020 (modified) at the exam, with a scientific calculator, a pencil, an eraser and a blank sheet; no other reference material is allowed. ExamHub does not reproduce the Code text, so keep a copy handy and look up the article quoted in each explanation.

What topics does the exam cover?

Three blocks: preparing the work (about 15%), installing and modifying plumbing systems (about 60%) and repairing and maintaining them (about 25%). The timed practice test draws its questions in the same 15/60/25 split. Site safety (trenches, confined spaces, falls) belongs to Section 1. Reading real drawings is not tested here: the bank covers when plans and specifications are required and what they must show, but it has no figures to read.

Which edition of the Plumbing Code do the questions follow?

The Québec Construction Code, Chapter III – Plumbing, based on the National Plumbing Code of Canada 2020 with Québec modifications, in force since July 11, 2024 (RBQ explanatory booklet, 2024). Questions on Québec-specific rules cite the article.

Are these the real exam questions?

No. ExamHub's questions are original, written from public texts (the Code, the RBQ explanatory booklet and the Safety Code for the construction industry). ExamHub is not affiliated with the CCQ.

How is this different from the Ontario 306A plumber quiz?

This quiz follows the Québec Code and French plumbing terminology (appareil sanitaire, siphon, évent, clapet antiretour, fosse de retenue) and includes rules that differ from the model code, such as the extended plumbing system limit and the Québec water heater and recirculation temperatures.

How is the practice test set up compared with the real exam?

The timed test draws 61 questions in the same 15% / 60% / 25% split as the three exam sections and gives you 3 hours, like the CCQ exam. Unlike the official exam it is closed book, so you learn the rules instead of looking them up. Pass mark: 60%.

Other free practice tests

306A Plumber
128 questions
128 questions on plumbing codes, DWV, and water distribution.
RBQ Administration
200 questions
200 questions covering financial management, PODC, Loi R-20, CCQ compliance, Building Act, and legal contracts.
ASP Construction (SSGCC)
150 questions
150 questions covering LSST, CSTC, fall protection, lockout, and trench safety.
TSSA CH-02 Heater Operator
100 questions
100 questions on propane, cylinders, construction heaters and torches, O. Reg. 215/01 and 213/91, and site safety.
TSSA Propane PPO-3 (ROT)
146 questions
PPO-3 cylinder filling: inspection and collar stamps, the 42% / 80% fill limits, trade measurement and O. Reg. 215/01.
TSSA OBT-3 Oil Burner Tech
150 questions
150 questions on OBT-3 scope, tanks and piping, burners, controls, venting and combustion.
EDM-A Elevator Mechanic
140 questions
140 questions on TSSA O. Reg. 209/01, ASME A17.1/CSA B44, safety circuits, hydraulics, and governors.
TSSA G2 Gas Technician
148 questions
148 questions on G2 appliances, water heaters, furnaces, hydronic heating, venting and controls.